{"id":15349,"date":"2024-05-31T11:24:28","date_gmt":"2024-05-31T09:24:28","guid":{"rendered":"https:\/\/roigconstruccions.com\/project\/parking-nuevos-ministerios\/"},"modified":"2024-06-11T13:18:57","modified_gmt":"2024-06-11T11:18:57","slug":"parking-nuevos-ministerios","status":"publish","type":"project","link":"https:\/\/roigconstruccions.com\/en\/project-en\/parking-nuevos-ministerios\/","title":{"rendered":"Parking Nuevos Ministerios"},"content":{"rendered":"<p>ROIG has been chosen for the expansion of the existing public car park, associated with the Nuevos Ministerios station, under the Paseo de la Castellana in Madrid.<\/p>\n<p>The car park, on a single floor and built below ground, has 2 access ramps and 2 exit ramps for vehicles, thus allowing all movements to\/from Paseo de la Castellana.<\/p>\n<p><strong>Updating<\/strong><strong><strong>and adapting<\/strong><strong><strong>to current regulations<\/strong><\/strong><\/strong><\/p>\n<p>The works that will be undertaken, in the 6,000 m2 of surface, are the introduction of new facilities, the modernization of the existing ones, the redistribution of its interior space, along with changes in the distribution through the punctual opening of passage holes in walls, the adaptation to accessibility and fire regulations and the installation of an elevator.<\/p>\n<p><strong>Fast charging points<\/strong><strong><strong>in the centre of Madrid<\/strong><\/strong><\/p>\n<p>SABA Parkings, the company awarded the contract for the &#8220;Operation of the car park at Nuevos Ministerios station&#8221; has decided to undertake the adaptation and expansion to put into use part of the car park that is in structure, partially enabling it with the aim of covering the demand for electric car charging in this area of Madrid, through the installation of 43 fast charging points. At the same time, the car park currently operated by SABA will be adapted to current regulations.<\/p>\n<p>Before starting the expansion, the ROIG team will have to carry out the rehabilitation of some areas of the existing car park such as the repair of the upper wall with fibre reinforced mortar, painting with acrylic paint, as well as some demolitions and openings necessary to carry out the final project.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.<\/p>\n","protected":false},"author":3,"featured_media":15341,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"_vp_format_video_url":"","_vp_image_focal_point":[],"footnotes":""},"project_category":[114],"project_tag":[1099,1100,1101,1102],"class_list":["post-15349","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-rehabilitation","project_tag-ampliacion-parking-en","project_tag-aplicacion-normativas-actuales-en","project_tag-puntos-de-recarga-rapida-en","project_tag-redistribucion-de-espacios-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Parking Nuevos Ministerios - Roig constructions<\/title>\n<meta name=\"description\" content=\"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Parking Nuevos Ministerios - Roig constructions\" \/>\n<meta property=\"og:description\" content=\"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/\" \/>\n<meta property=\"og:site_name\" content=\"Roig constructions\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-11T11:18:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/\",\"url\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/\",\"name\":\"Parking Nuevos Ministerios - Roig constructions\",\"isPartOf\":{\"@id\":\"https:\/\/roigconstruccions.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg\",\"datePublished\":\"2024-05-31T09:24:28+00:00\",\"dateModified\":\"2024-06-11T11:18:57+00:00\",\"description\":\"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.\",\"breadcrumb\":{\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage\",\"url\":\"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg\",\"contentUrl\":\"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/roigconstruccions.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Proyectos\",\"item\":\"https:\/\/roigconstruccions.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Parking Nuevos Ministerios\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/roigconstruccions.com\/#website\",\"url\":\"https:\/\/roigconstruccions.com\/\",\"name\":\"Roig constructions\",\"description\":\"We are a construction and services company, both in new construction and renovation, modern and committed to customer service.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/roigconstruccions.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Parking Nuevos Ministerios - Roig constructions","description":"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/","og_locale":"en_US","og_type":"article","og_title":"Parking Nuevos Ministerios - Roig constructions","og_description":"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.","og_url":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/","og_site_name":"Roig constructions","article_modified_time":"2024-06-11T11:18:57+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/","url":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/","name":"Parking Nuevos Ministerios - Roig constructions","isPartOf":{"@id":"https:\/\/roigconstruccions.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage"},"image":{"@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage"},"thumbnailUrl":"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg","datePublished":"2024-05-31T09:24:28+00:00","dateModified":"2024-06-11T11:18:57+00:00","description":"ROIG has been chosen for the expansion of the public car park of Nuevos Ministerios, on the Paseo de la Castellana in Madrid.","breadcrumb":{"@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#primaryimage","url":"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg","contentUrl":"https:\/\/roigconstruccions.com\/wp-content\/uploads\/2024\/05\/visita-paseo-de-la-castellana-madrid.jpg","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/roigconstruccions.com\/project-en\/parking-nuevos-ministerios\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/roigconstruccions.com\/en\/"},{"@type":"ListItem","position":2,"name":"Proyectos","item":"https:\/\/roigconstruccions.com\/project\/"},{"@type":"ListItem","position":3,"name":"Parking Nuevos Ministerios"}]},{"@type":"WebSite","@id":"https:\/\/roigconstruccions.com\/#website","url":"https:\/\/roigconstruccions.com\/","name":"Roig constructions","description":"We are a construction and services company, both in new construction and renovation, modern and committed to customer service.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/roigconstruccions.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project\/15349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/comments?post=15349"}],"version-history":[{"count":1,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project\/15349\/revisions"}],"predecessor-version":[{"id":15350,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project\/15349\/revisions\/15350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/media\/15341"}],"wp:attachment":[{"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/media?parent=15349"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project_category?post=15349"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/roigconstruccions.com\/en\/wp-json\/wp\/v2\/project_tag?post=15349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}